Another bulk carrier carrying wind turbine blades (36 pieces) has arrived at Paldiski South Harbour. Mv Polydefkis, 229 meters in length, is being discharged for the first time at berths 4 & 5 using our two mobile harbor cranes, Gottwald and Liebherr.
This is the final batch for the Sopi-Tootsi wind farm, which will comprise a total of 38 turbines with a combined capacity of 255 MW.
(Source: https://esteve.ee/en/mv-polydefkis-at-paldiski-south-harbour/)